Skip to main content
Western Kentucky University
EMERGENCY ALERT SYSTEM:

WKU WEATHER ALERT:

Due to the impending winter weather, WKU Owensboro will close at noon today (Wed., 3/4).

WKU Glasgow evening classes that begin at 5 pm today will be canceled and the WKU Glasgow campus will close at 7 pm.

WKU Elizabethtown-Fort Knox campus will close today at 3 pm and will remain closed Thurs., Fri, and Sat., March 5-7.

Should inclement weather make travel hazardous, residence halls will remain open until Saturday. Follow WKU Housing & Residence Life for updates.

The high school regional basketball tournament games scheduled for tonight have been canceled. Games will be rescheduled for Friday/Saturday.

Follow WKU News for the latest updates. #WKUAlert.

Dero Downing Student Union Renovation Project

DUC Renovation RenderingDUC Renovation RenderingDUC Renovation RenderingDUC Renovation RenderingDUC Renovation RenderingDUC Renovation RenderingDUC Renovation RenderingWKU StoreDSUDSU

Moving in: The WKU Store prepares for a fall 2013 opening

The New Dero Downing Student Union is Coming Soon!

WKU is pleased to commence the two-year, $49 million renovation project of the Downing University Center, WKU's main student center on campus. Upon completion in the fall of 2014, the state-of-the-art renovation project will unveil an updated, innovative, sustainable space that will benefit the entire WKU community. 

The new Dero Downing Student Union will be completed in phases, with initial facilities and services opening to the public in the fall of 2013.

Many of the changes to the building, originally opened in 1970, will be at the request of students. Students were included in tours of student centers at other universities and have been instrumental in providing feedback about features and benefits that will be implemented as the new DUC comes to life.

Much of the building will be closed in phases. Occupants, including various offices, student activities and dining services, will be relocated during construction. Some of the WKU dining services will be relocated to a temporary structure near the Preston Center while others will find permanent homes in new locations.

The building is being designed to be LEED ® (Leadership in Energy and Environmental Design) certified including features such as local and/or sustainable materials, energy efficient systems and daylight harvesting.

This website exists to inform the WKU community and beyond of the most up-to-date information available regarding moving dates, relocation areas and more. We invite you to contact us with your questions or comments.


Please view the Relocation Schedule at the top of this page for detailed information on moving dates and relocation areas.




Renovation Highlights:

  • All new building systems, such as mechanical, electrical and plumbing
  • A 24-hour study area
  • Larger and enhanced meeting rooms
  • New recreation area on the first floor
  • New offices for staff, Student Government Association and student organizations
  • Moving the WKU Store to the ground floor
  • Upgraded food services area
  • Balcony seating for Fresh Food Company 
  • New entrances on both sides

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/25/14