Skip to main content
Western Kentucky University

Cherry Hall Limestone Step Repairs

190431

Cherry Hall Limestone Step Repairs

This project involved demolition of damaged step sections; selective demolition/salvage of existing limestone step material; transporting/hauling salvaged limestone to the storage yard at the corner of Forrest Drive and South Way; replacement of 240.5 linear feet of front steps with high quality limestone steps consisting of 6 treads and 6 risers, each 40'1" long, with rounded edges for safety; 250 square feet of cement was poured adjacent to the full length of the steps and control joints were installed as specified.

Cherry Hall Limestone Step Repair "In Progress"

Cherry Hall Limestone Step Repair
"In Progress"

 

Cherry Hall Limestone Step Repair "In Progress (2)"

Cherry Hall Limestone Step Repair
"In Progress (2)"

 

Cherry Hall Completed Limestone Step Repair

Cherry Hall Limestone Step Repair

"Completed"

 

Cherry Hall Completed Limestone Step Repair (2)

Cherry Hall Limestone Step Repair

"Completed (2)"

     

Project Manager

Alfonso Casana

 

Project Budget

$ 30,170.00

     
    Return to Renovations Page

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/24/14