Skip to main content
Western Kentucky University

FAC Service Drive Gate

190541

FAC Service Drive Gate

This project included the installation of a new vehicle control gate at the FAC Service Drive (between WAB and Schneider).

FAC Service Drive Gate Before

FAC Service Drive Gate - Before

 

FAC Service Drive Gate - After

FAC Service Drive Gate - After

 

Project Manager

Jed Peterson

 

Project Budget

$ 38,216.00

    Return to Renovations Page

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/24/14