Skip to main content
Western Kentucky University

CEES News

News

Displaying Articles for Category: News  (view all categories)
Phase 2a for Durbin Project Completed; first passive home to be constructed ... (December 14th, 2013)

Phase 2a for the initial road and utility infrastructure, including permeable parking and a road-length bioswale designed to help with stormwater management, was completed in fall, 2013, using EPA 319(h) funds from the KY Division of Water.

NASA supports Center to work with STEM Educators (December 13th, 2013)

This NASA-funded project will implement an innovative collaborative project that addresses the need to increase the number of qualified science, technology, engineering, and mathematics (STEM) educators.

Showing All Results
Categories
Latest Headlines
Phase 2a for Durbin Project Completed; first passive home to be constructed ...

Phase 2a for the initial road and utility infrastructure, including permeable parking and a road-length bioswale designed to help with stormwater management, was completed in fall, 2013, using EPA 319(h) funds from the KY Division of Water.

NASA supports Center to work with STEM Educators

This NASA-funded project will implement an innovative collaborative project that addresses the need to increase the number of qualified science, technology, engineering, and mathematics (STEM) educators.

Featured Articles

No Featured Articles for this category

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/25/14