breaking ground with first scoop
excavator is busting rock before removing from the ground
digging soil out of the area for the ond
surveying the depth
ranking and smoothing the bottom of area
unfolding the first layer of padding
unfolding the liner
laying the second pad
lining up pad and liner
survey and anchoring nails
anchoring nails to hold padding and liner in place
marking the diameter is completed
trimming the corners off to made the liner round
volunteers trimming the corners
covering the liner with top soil
last scoop of soil to cover the liner
moving a tree to set in the pond
placing the tree
the tree is set
installation of pond completed
pond with water
planting flowers